Jumper Configuration Instructions
Changing the transformer configuration jumper is required, PRIOR TO SUPPLYING POWER TO THE MACHINE, if any of the following apply:
IMPORTANT: Failure to install the proper configuration jumper may result in damage to sensitive electronic controls and may void warranty.
∙Location Voltage 200 – 208 Volt service and are connecting a model rated for 240 Volt operation.
Replace the 240 Volt jumper with the 208 Volt jumper per the conversion label, located on the rear of the tumble dryer, sign and date conversion label to document the conversion.
∙You have 400 – 415 Volt service and are connecting a model rated for 380 Volt operation.
Electrical Requirements
Ferrite Ring Installation
Models with RM Control Suffix Only
The ferrite ring provided in the literature packet must be installed over the power leads during connection of electrical service. The ferrite protects the sensitive electronic controls from destructive electrical disturbances which may be present on power lines to the machine. Failure to properly install the ferrite ring may result in damage to the electronic controls and will void control warranty.
To Install:
1.Immediately after connection of power leads and before applying power to machine, locate each of the incoming service leads including ground.
2.Snap the ferrite ring closed over all the service leads inside of the contactor box as shown. It is important that the ferrite ring be installed inside the contactor box. Refer to Figure 13. Do not install the ferrite outside of the box or other area. Make sure that service leads are in the center of the ferrite before closing the ring so not to pinch or damage leads.
|
| CE Models | |
|
|
| 3 |
1 |
|
|
|
| 1 |
|
|
| 2 |
| 2 |
| TMB2270N |
| TMB2271N |
1 | Ferrite Ring | 3 | Models Through 7/31/11 |
2 | Junction Box |
|
|
Figure 13