Chapter 2: Installing the Switch

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.

2.Place the switch on a level, secure surface.

3.Make sure the following components are included in your switch package. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.

ˆOne AT-9400 Gigabit Ethernet Switch

ˆTwo rack-mount brackets

ˆEight flathead Phillips rack-mount bracket screws

ˆAC power cord (AC switches only; Americas, EU, Australia, and UK only)

ˆAC power cord retaining clip (AC switches only)

ˆManagement cable for local management

ˆDocumentation CD

ˆWarranty card

52

Page 52
Image 52
Allied Telesis AT-9424T/POE, AT-9408LC/SP manual Unpacking the Switch