Alto-Shaam 750-S, 300-S StaCKIng InStrUCtIonS, inst a l l a tio n, Stacking Configurations, Model

Models: 1200-S 1000-S 1000-UP 750-S 1200-UP 500-S 300-S Holding Cabinet

1 51
Download 51 pages 31 b
Page 12
Image 12
StaCKIng InStrUCtIonS

inst a l l a tio n

StaCKIng InStrUCtIonS

1)If the two appliances were shipped together from the factory, the top unit will have the casters already removed. a stacking kit will be included with the shipment.

If casters need to be removed: lay the unit on its back, and remove the set screw on each caster. Pull the casters out of the unit.

2)while appliance is laid on its back, insert one stacking post in each of the four corners of the upper unit. Secure the stacking posts using one screw and two flat washers that come with the stacking kit.

note: The flange on the stacking posts must face the outside of the unit.

3)remove the four top mounting screws from the lower unit. Place the upper appliance, which has the stacking posts installed, on top of the bottom unit. Center the top unit from front to back. re-install the four screws through the flange of the four stacking posts.

STACKING

POSTS

Stacking Configurations CASTER SET SCREW

Model TOP

MOUNTING

SCREWS

Can be stacked with: TOP

MOUNTING

SCREWS

Stacking Configurations

Model

Can be stacked with:

 

 

300-S

300-S or 300-TH/III

 

No Stacking Hardware needed.. Align dimples at top and bottom of units.. It is

 

recommended that the legs be removed from the top unit before stacking..

500-S

500-S, 500-TH-II or 500-TH/III

750-S

750-S, 750-TH-II, 750-TH/III, 767-SK or 767-SK/III

1000-S

1000-S, 1000-TH/III, 1000-SK/II or 1000-SK/III

holding cabinets installation/operation/service manual - pg. 10

Page 12
Image 12
Alto-Shaam 750-S, 300-S StaCKIng InStrUCtIonS, inst a l l a tio n, Stacking Configurations, Model, Can be stacked with