AMD 8 manual 7/D,C, Northbridge Connect State Diagram, Preliminary Information, Power Management

Models: 8

1 106
Download 106 pages 35.4 Kb
Page 28
Image 28
7/D,C

Preliminary Information

AMD Athlon™ XP Processor Model 8 Data Sheet

25175H— March 2003

Connect State

Figure 6 below and Figure 7 on page 17 show the Northbridge

Diagram

and processor connect state diagrams, respectively.

 

 

4/A

 

 

 

2/A

1

 

 

 

Disconnect

Connect

Disconnect

 

Pending

Requested

 

 

 

 

3/C

3

5/B

 

8

8

Disconnect

Reconnect

Probe

Pending

Pending 2

 

 

7/D,C

6/C

Probe

7/D

 

Pending 1

 

 

Condition

 

 

1

A disconnect is requested and probes are still pending.

 

 

2

A disconnect is requested and no probes are pending.

 

 

3

A Connect special cycle from the processor.

 

 

4

No probes are pending.

 

 

5

PROCRDY is deasserted.

 

 

6

A probe needs service.

 

 

7

PROCRDY is asserted.

 

 

 

Three SYSCLK periods after CLKFWDRST is deasserted.

8

Although reconnected to the system interface, the

Northbridge must not issue any non-NOP SysDC

 

commands for a minimum of four SYSCLK periods after

 

deasserting CLKFWDRST.

 

 

 

Action

A

Deassert CONNECT eight SYSCLK periods

after last SysDC sent.

 

BAssert CLKFWDRST.

CAssert CONNECT.

DDeassert CLKFWDRST.

Figure 6. Northbridge Connect State Diagram

16

Power Management

Chapter 4

Page 28
Image 28
AMD manual 7/D,C, Northbridge Connect State Diagram, Preliminary Information, AMD Athlon XP Processor Model 8 Data Sheet