American Power Conversion FM, DX manual Final Inspection Checklist, Ensure that, Owner Acceptance

Models: DX FM

1 96
Download 96 pages 14.45 Kb
Page 25
Image 25
Final Inspection Checklist

Final Inspection Checklist

Ensure that:

The system interior and exterior are clean and free from debris.

Installed options (smoke detectors, firestat, water detector, remote sensor, remote relay shutdown, dry contact alarm, essential/non-essential lockout, Redundant Unit Group control, condensate pump, etc.) are operating correctly.

Setpoints and deadbands are set.

Packaging materials are disposed of properly.

You have sent the start-up form to APC.

Owner Acceptance

To ensure proper unit operation and trouble free operation the following procedures must be completed and filed with the customer for future reference.

Review installation of the equipment. Verify that installation is in compliance with Installation manual instructions/recommendations.

Complete start-up checklist and file with owner and factory to activate warranty policy.

Train personnel responsible for maintenance and minor adjustments to temperature & humidity set points.

Recommend spare parts for the owner to keep on hand, especially for critical operation installations.

Offer a list of contacts for service, technical assistance, replacement parts.

NetworkAIR FM DX 60 Hz Operation, Maintenance, and Troubleshooting

15

Page 25
Image 25
American Power Conversion FM, DX manual Final Inspection Checklist, Ensure that, Owner Acceptance