Internal piping diagram

In

Out

From

 

 

 

 

Coils

Out

FullFull

Bypass Open

In

Out

na1736b

1Entering water union (top piping)

2Leaving water union (top piping)

33-way actuator control valve—3/4 in

4Bypass shutoff ball valve—3/4 in

5Condensate drain

6Leaving water union (bottom piping)

7Condensate pump

8Entering water union (bottom piping)

9Bottom condensate pan : Bottom coil

;Top condensate pan

<Top coil

=Flow meter

>Inlet shutoff valve—1 in

10

InRow RC Installation

Page 16
Image 16
APC ACRC103, ACRC100 manual Internal piping diagram, Out From Coils FullFull Bypass Open