APC ACRC100, ACRC103 Without CDU, Top piping InRow Bottom piping To customer Supplied chiller

Models: ACRC100 ACRC103

1 36
Download 36 pages 32.09 Kb
Page 15
Image 15

Without CDU

Top piping

InRow

RC

Bottom piping

InRow

RC

To customer-

supplied chiller

InRow

RC

InRow

RC

To customer-

supplied chiller

na2609a

Flex hose or copper

Y-strainer with 20 mesh screen (field

Copper tubing

installed)

Shutoff valve (field-installed)

Circuit setter

 

Note: Install isolation valves and particulate strainers with 20 mesh stainless steel screen (opening size = 865 micron) in the supply line between the chiller and the CDU. If the system is to be set up as an isolated loop - a chiller and pipe layout, dedicated only to supplying RC units and no other equipment - the strainer may be placed in the piping circuit before the pump. Thoroughly flush the system to remove all debris and process chemicals.

Note: Top or bottom entry can be chosen individually for each type of connection, i.e. power, condensate drain, humidifier water supply, chilled water supply and chilled water return. Top piping configurations will have the same valves and strainers as bottom piping configurations.

InRow RC Installation

9

Page 15
Image 15
APC ACRC100, ACRC103 manual Without CDU, Top piping InRow Bottom piping To customer Supplied chiller