APC BC300 Series manual SBP Electrical Schematic

Models: BC300 Series

1 38
Download 38 pages 11.26 Kb
Page 10
Image 10

Installation

AC Line

Input

F4

L1

F5

L2

F6

L3

N

GRD

UPS Input

Disc. Switch

Shown in Open

Position

1 2

34

56

AC Input

Uninterruptible

to UPS

Power Supply

L1

L1 L1

L2

L2 L2

L3

L3 L3

N G N

GG

 

Maintenance

 

Bypass Switch

 

Contacts marked "U"

 

closed in "UPS".

AC Output

Contacts marked "BP"

from UPS

closed in Bypass.

 

Contacts are Make

F1

before Break.

4

 

3

 

U

F2

 

 

7

 

8

U

F3

12

U

11

 

N

 

 

 

 

16

U

15

 

20

U

19

 

2

BP

1

 

6

BP

5

 

10

BP

9

 

14

BP

13

 

18

BP

17

TO CRITICAL

LOAD CENTER

AC Output to Critical Load

L1

L1

L2

L2

L3

L3

N

N

G

GRD

Notes:

1.208V F1, F2, F3 = 120A

2.480V F1, F2, F3 = 55A

3.208V F4, F5, F6 = 170A

4.480V F4, F5, F6 = 75A

5.All AC power cabling is 3- or 4-wire + Ground at 208VAC / 480VAC 3-phase.

6.Installation must comply with all applicable national and local codes.

Figure 2 - SBP Electrical Schematic 208V & 480V

 

 

 

 

 

Relay

"UPS in Static Bypass" Ind. Light

 

 

 

 

 

R

13

G

 

 

 

 

 

14

 

UPS Maintenance

UPS Input

1

9

"UPS in Maintenance Bypass" Ind. Light

Disconnect

Bypass Switch

 

 

 

Switch

 

 

 

 

 

 

 

 

 

UPS Bypass

On-Off

 

 

R

 

 

 

1

BYP

2

1

2

 

 

 

3

UPS

4

3

4

 

 

 

5

BYP

6

5

6

 

 

 

7

UPS

8

 

 

 

 

 

9BYP 10

11 UPS 12

13 BYP 14

 

 

 

15 UPS 16

 

 

 

 

 

 

 

 

Keyed Solenoid Lock Release Switch

 

 

 

17 BYP 18

 

 

 

 

 

 

 

 

Lock

Release

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19 UPS 20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

BYP

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

BYP

4

 

 

 

 

 

 

 

 

13

14 0X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

BYP

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

UPS

8

 

 

 

 

 

 

 

 

22

21 X0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

31

32 X0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

43

44

0X

 

 

F1-F2-F3

F4-F5-F6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Solenoid Lock

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mechanism

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

(Energize to Unlock)

 

 

 

 

 

 

 

 

 

 

440, 450, 480

 

440, 450, 480

120 VAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VAC Primary

 

VAC Primary

X

+

 

 

 

 

 

 

 

 

 

F1A

H1

H3

H2 H4

H1

H3

H2 H4

 

-

120 VDC

 

 

 

 

 

 

 

 

1A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X1

 

X2

X1

 

X2

 

 

 

 

 

 

 

 

 

1 2 3

4

5 6

 

120 VAC

 

120 VAC

 

5A

 

G L1 L2 L3

G L1 L2 L3

G L1 L2 L3

G L1

L2

L3

 

Secondary

 

Secondary

 

 

C

N

N

 

XFMR 1

 

XFMR 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC Output

 

 

 

 

 

 

D

C

 

 

 

 

 

 

 

 

 

AC Output from UPS

AC Line Input

AC Input to UPS

Auxiliary Switch Circuit

 

 

 

 

 

 

 

 

 

to Critical Load

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notes:

1. F1, F2, F3 = 60A

2. F4, F5, F6 = 80A

3. All AC power cabling is 3 wire + Ground at 450VAC 3-phase.

4. Installation must comply with all applicable national and local codes.

 

Figure 3 - SBP Electrical Schematic 450V

990-1401

 

 

 

 

10

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

 

Page 10
Image 10
APC BC300 Series manual SBP Electrical Schematic