temperature controls contractor. The contractor shall confirm that the communication network linking controllers within the [Add building name] functions properly, before connecting the new controllers to the campus network.

3.15DDC SOFTWARE

A. Provide sufficient internal memory for the specified control sequences and logging. There shall be a minimum of 15% of available memory free for future use.

END OF SECTION

JANUARY 2008

UCCS STANDARDS

15950-42

Page 42
Image 42
APC UCCS Temperature Control specifications DDC Software, END of Section