Maintenance – Parts Replacement

UPS / XR

Install the Battery Module in the lowest

Position the Battery Unit to slide in between

available bay (four across in 523 mm/(20 in)

the grooves and push completely into the

UPS versions, two across in 352 mm/(14 in)

UPS to ensure connection.

UPS versions).

 

If a problem is reported, ensure that the modules in question are correctly installed. If the problem persists, see the section Troubleshooting.

Note

Allow for a 24-hour recharging period of the batteries after system start-up.

Note

32

Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation

990-2282A-001