Operation – Operation Procedures

Restart – parallel system.

Only trained personnel familiar with the construction and the equipment may

restart the UPS system.

Warning

From the XR Enclosure(s) (if available): Connect the batteries on the UPS units by pushing them in.

From the XR Enclosure(s) (if available): Set the DC disconnect switch (if available) to the ON position.

From the external MBP: Turn all output switches (Q002) to position “1” (ON).

From the UPS: Turn load ON each of the UPS units from the display via Control Turn

Load onYes, turn Load on.

From the UPS: Connect the batteries by pushing them in.

From the external MBP: Turn all input switches (Q001) to position “1” (ON).

From the external MBP: Turn the output isolation breaker (Q004) to position “1” (ON).

Check that the load is ON.

The UPS system is now ready to support the load.

Note

Auto-detection on frequency – if a problem occurs call APC Customer Support (see the back cover of this manual).

Note