Operation – Operation Procedures
Restart – parallel system.
Only trained personnel familiar with the construction and the equipment may
restart the UPS system.
Warning
From the XR Enclosure(s) (if available): Connect the batteries on the UPS units by pushing them in.
From the XR Enclosure(s) (if available): Set the DC disconnect switch (if available) to the ON position.
From the external MBP: Turn all output switches (Q002) to position “1” (ON).
From the UPS: Turn load ON each of the UPS units from the display via Control – Turn
Load on– Yes, turn Load on.
From the UPS: Connect the batteries by pushing them in.
From the external MBP: Turn all input switches (Q001) to position “1” (ON).
From the external MBP: Turn the output isolation breaker (Q004) to position “1” (ON).
Check that the load is ON.
The UPS system is now ready to support the load.
Note
Note
21 |