Operation – Operation Procedures
For details on how to remove Battery Locks (if available) see the section How to remove and install battery locks (if available).
Total power off – single system with MBP. |
|
Check that the load is OFF. | From the UPS: Turn load OFF the UPS from |
| the display via |
| turn Load off. |
From the external MBP: Turn the output switch (Q002) to position “0” (OFF).
From the XR Enclosure(s) (if available): Set the DC disconnect switch (if available) on the XR Enclosure(s) to the OFF position.
From the XR Enclosure(s) (if available): Disconnect the batteries by pulling them out to the red disconnect line.
From the external MBP: Turn the input switch (Q001) to position “0” (OFF).
From the UPS: Disconnect the batteries in the UPS by pulling them out to the red disconnect line.
Total power off – parallel system.
Check that the load is OFF.
From the UPS: Turn load OFF each of the UPS units from the display via
Load off–Yes, turn Load off.
From the external MBP: Turn the output isolation breaker (Q004) to position “0” (OFF).
From the external MBP: Turn all input switches (Q001) to position “0” (OFF).
From the UPS: Disconnect the batteries in the UPS units by pulling them out to the red disconnect line.
From the external MBP: Turn all output switches (Q002) to position “0” (OFF).
From the XR Enclosure(s) (if available): Set the DC disconnect switch (if available) to the OFF position.
From the XR Enclosure(s) (if available): Disconnect the batteries on the UPS units by pulling them out to the red disconnect line.
17 |