Operation – Operation Procedures

Parallel System – turning into normal operation from external bypass.

Never attempt to turn the UPS into normal operation till you have verified that there are no internal UPS faults.

Caution

From the external MBP: Turn all input

From the external MBP: Check that all the

switches (Q001) to position “1” (ON).

output lamps (Q002) are lit.

From the external MBP: Turn all output

From the UPS: Connect the batteries in the

switches (Q002) to position “1” (ON). The

UPS by pushing them in.

lamp indicator of the output isolation breaker

 

(Q004) is still lit.

 

From the XR Enclosure(s) (if available): Set

From the XR Enclosure(s) (if available):

the DC disconnect switch (if available) to the

Connect the batteries by pushing them in.

ON position.

 

From the UPS: Turn ON all UPS units from

From the external MBP: Check that all the

each display via Control–Turn Load ON–

lamps (Q002) are unlit.

Yes, Turn Load ON.

 

From the UPS: Turn the UPS units into

From the external MBP: Check that the lamp

bypass from one UPS display via Control–

indicator of the output isolation breaker is lit

UPS into bypass–Yes, UPS into bypass.

(Q004).

Check that the UPS units are in bypass. The

 

green (LOAD ON) and the yellow (BYPASS)

 

LEDs are lit.

 

From the external MBP: Turn the output isolation breaker (Q004) to position “1” (ON). Now the lamps (Q003 + Q004) are lit.

From the UPS: Turn the UPS units out of bypass from the display via ControlUPS out of bypassYes, UPS out of bypass.

From the external MBP: Turn the bypass switch (Q003) to position “0” (OFF). The lamps (Q004) are unlit, but (Q003) is lit until the UPS is running in normal operation.

990-2282A-001

Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation

11

Page 17
Image 17
APC VT manual Each display via Control-Turn Load on