Operation – Operation Procedures
20 Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation 990-2282A-001
Restart – single system with MBP.
Note
Auto-detection on frequency – if a problem occurs call APC Customer Support (see the
back cover of this manual).
Warning
Only trained personnel familiar with the construction and the equipment may
restart the UPS.
From the XR Enclosure(s) (if available):
Connect the batteries by pushing them in.
From the UPS: Connect the batteries by
pushing them in.
From the XR Enclosure(s) (if available): Set
the DC disconnect switch (if available) to t h e
ON position.
From the external MBP: Turn the input switch
(Q001) to position “1” (ON).
From the external MBP: Turn the output
switch (Q002) to position “I” (ON).
From the UPS: Turn load ON from the display
via Control Turn Load on Yes, t ur n
Load on.
Check that the load is ON.
Note
The UPS is now ready to support the load.
Note
Auto-detection on frequency – if a problem occurs call APC Customer Support (see the
back cover of this manual).