6
Upgrading an Existing G700 with an S8300 — R2.0 to R2.x
On-site Preparation for the Upgrade
Installation and Upgrades for G700 and S8300 271
December 2003
Pre-Upgrade Tasks — If the T arget S8300 is the Primary ControllerIf the S8300 is configured as an LSP, skip to Upgrade the S8300 on page 282.
CAUTION:
If you are upgrading an S8300 primary controller that has LSPs registered to it, the LSPs
must be upgraded before the primary controller. (You can use the SAT command, list
media-gateway, to see if there are LSPs registered to the S8300.)
Perform the following procedures if you are upgrading an S8300 that is configured as a primary
controller.
NOTE:
It is no longer necessary to disable Terminal Translation Initialization (TTI) before an
upgrade or to enable it after an upgrade.
Clear Alarms
1On the Maintenance Web Interface under Alarms and Notification (Alarms for R2.0), click View
Current Alarms (Current Alarms for R2.0).
2If no alarms are listed, skip the next two steps.
3If alarms are listed, click Clear All.
4Resolve any remaining major alarms through the Communication Manager SAT.
Check Link Status
1Open a SAT session.
2Enter display communication-interface links.
3Note all administered links.
4Enter status link number for each administered link.
5Enter list signaling group.
6Note the signaling groups listed by number.
7For each of the signaling groups listed, enter status signaling group number.
8Make a note of any links that are down.
Record All Busyouts
1At the SAT prompt, type display errors and press Enter.
2Look for type 18 errors and record any trunks that are busied out — you will return them to their
busy-out state after the upgrade.