B
A
Figure 12/Ilus. 12
C
Figure 13/Ilus. 13
D
Figure 14/Ilus. 14
E n g l i s h
DISHWASHER PREPARATION (continued)
Removing the Toe Panel
Regular Toe Panel
The toe panel is loosely attached with tape. Remove the tape and pull the toe panel away from the dishwasher. Set the toe panel aside. It will be reinstalled later.
SHY66 and SHX56 Base and Toe Panel The base and toe panel are in place on the dishwasher, but are not attached.
Remove the toe panel first, as shown in Figure 12, letter A, then remove the base, as shown in Figure 12, letter B
Installing the 90° Elbow Fitting
NOTE: The 90° elbow fitting is not supplied with the dishwasher, and must be purchased separately. If the dishwasher’s hot water supply line is to be copper tubing, make certain the elbow has a compression fitting.
Apply Teflon tape or other pipe sealant to all threaded connectors.
Orient the hot water supply connection leg of the elbow toward the channel opening in the dishwasher base.
Junction Box Preparation
1)Remove the junction box cover by removing the screw on the left side of the junction box, as shown in Figure 13, letter C, and lifting the junction box cover up and off.
2)Remove the strain relief plate by removing the screw at the back of the junction box, as shown in Figure 14, letter D and sliding the strain relief plate out.
3)Set the junction box cover, strain relief plate, and screws aside. They will be
16 Dishwasher Preparation Préparatio du