Bryant 340MAV instruction manual Checklist—Installation

Models: 340MAV

1 48
Download 48 pages 30.25 Kb
Page 46
Image 46

CHECKLIST—INSTALLATION

 

LOAD CALCULATION

____________

Heating Load (Btuh)

____________

Cooling Load (Btuh)

____________

Furnace Model Selection

COMBUSTION AIR VENT PIPING

 

Termination Location

________

Roof or Sidewall

________

Termination Kit-2 Pipe or Concentric

________

Combustion-Air Pipe Length

________

Combustion-Air Elbow Quantity

________

Vent Pipe Length

________

Vent Pipe Elbow Quantity

________

Pipe Diameter Determined from Sizing Table

________

Pipe Sloped To Furnace

 

Pipe Insulation

________

Over Ceilings

________

Low-Ambient Exposed Pipes

 

Condensate Drain

________

Unit Level or Pitched Forward

________

Internal Tubing Connections Free of Kinks

and Traps

 

________

External Drain Connection Leak Tight and

Sloped

 

________

Condensate Trap Primed before Start-Up

________

Heat Tape Installed if Required

 

CHECKLIST—START-UP

________

Gas Input Rate (Set Within 2 percent of

Rating Plate)

 

________

Temperature Rise Adjusted

 

Thermostat Anticipator

________

Anticipator Setting Adjusted or

________

Cycle Rate (3 Cycles per Hr) Selected

 

Safety Controls Check Operation

________

Primary Limit

________

Pressure Switch

—46—

Page 46
Image 46
Bryant 340MAV instruction manual Checklist—Installation