CHECKLIST—INSTALLATION
| LOAD CALCULATION |
____________ | Heating Load (Btuh) |
____________ | Cooling Load (Btuh) |
____________ | Furnace Model Selection |
COMBUSTION AIR VENT PIPING | |
| Termination Location |
________ | Roof or Sidewall |
________ | Termination |
________ | |
________ | |
________ | Vent Pipe Length |
________ | Vent Pipe Elbow Quantity |
________ | Pipe Diameter Determined from Sizing Table |
________ | Pipe Sloped To Furnace |
| Pipe Insulation |
________ | Over Ceilings |
________ |
| Condensate Drain | |
________ | Unit Level or Pitched Forward | |
________ | Internal Tubing Connections Free of Kinks | |
and Traps | ||
| ||
________ | External Drain Connection Leak Tight and | |
Sloped | ||
| ||
________ | Condensate Trap Primed before | |
________ | Heat Tape Installed if Required | |
| ||
________ | Gas Input Rate (Set Within 2 percent of | |
Rating Plate) | ||
| ||
________ | Temperature Rise Adjusted | |
| Thermostat Anticipator | |
________ | Anticipator Setting Adjusted or | |
________ | Cycle Rate (3 Cycles per Hr) Selected | |
| Safety Controls Check Operation | |
________ | Primary Limit | |
________ | Pressure Switch |