Appendix A - Figures (continued)
Figure Number | Page Number | Description |
Section III - Boiler Assembly Instructions (Knockdown Boiler) (continued) | ||
Figure 25 | 42 | Internal Wiring Harness - Length Adjustment for Penetration Through Side |
|
| of Jacket Front Panel |
Figure 26 | 44 | Install Top Corner/Intermediate Panels |
Figure 27 | 44 | Install Jacket Front Panel |
Figure 28 | 45 | Jacket Split Rear Panel Detail |
Figure 29 | 45 | Install Jacket Split Rear Panel |
Figure 30a | 46 | Installing Jacket Top Panels - Viewed From Front |
Figure 30b | 47 | Install Jacket Top Panels - Viewed From Rear |
Figure 30c | 47 | Install Jacket Rear Top Panel - Viewed Front Rear |
Figure 31 | 47 | Install Burner Swing Door |
Figure 32 | 49 | Install 3rd Pass Flueway Baffles (4 thru 11 Section Boilers Only) |
Figure 33 | 49 | Install 2nd Pass Flueway Baffles |
Figure 34 | 50 | Secure Burner Swing Door for Tight Perimeter Seal |
Figure 35 | 50 | Install Burner Adapter Plate and Burner to Burner Swing Door |
Figure 36 | 51 | Burner Adapter Plate Options |
Figure 37 | 52 | Install Jacket Front Panel Harness Cover Plates and Logo Plate |
Figure 38 | 52 | Purpose of tappings in Supply Manifold |
Figure 39 | 53 | Install Standard Trim and Operating Control |
Figure 40 | 53 | Control Connections to Internal Wiring Harness |
Figure 41 | 54 | Install Probe Low Water |
Figure 42 | 54 | Install High Limit Control |
Figure 43 | 55 | Install Modulation Control |
Figure 44 | 55 | Install Low/High/Low Control |
Figure 45 | 55 | Install Modulation Control |
Figure 46 | 56 | Install Flue Outlet Damper Assembly |
Figure 47 | 57 | Install Jacket Panels for Optional Burner Swing Door Cover |
Section IV - Installation Instructions | ||
Figure 48 | 58 | Packaged Boiler Shipping Information |
Figure 49a | 59 | Recommended MPC Minimum Piping - Single Boiler Application |
Figure 49b | 60 | Recommended MPC Minimum Piping - Multiple Boiler Application |
Figure 50a | 61 | Alternate MPC Minimum Piping - Single Boiler Application |
Figure 50b | 62 | Alternate MPC Minimum Piping - Multiple Boiler Application |
Figure 51 | 63 | Parallel Piping Conversion |
Figure 52 | 63 | Typical Burnham Boiler - |
Figure 53 | 63 | Recommended Piping for Combination Heating & Cooling (Refrigeration) |
|
| Systems |
Figure 54 | 64 | Discharge Piping for Pressure Relief Valve |
Section V - Operating Instructions
Section VI - Service Instructions
Section VII - Burner Specifications
105