Burnham FM01FD00B manual

Models: FM01FD00B

1 108
Download 108 pages 28.47 Kb
Page 42
Image 42

c.BSD with right hand hinge arrangement - harness exits right side of jacket front panel en route to control panel.

d.BSD with right hand hinge arrangement - harness exits left side of jacket front panel en route to control panel.

Locate two (2) cable clamps and secure harness to vertical rails with two (2) #8 x ½ hex head sheet metal screws as shown in Figure 24g, clamp must be facing inward to prevent interference with jacket.

7.Adjust length of internal wiring harness to match boiler size, see Table IX and Figure 25 for details.

a.4 thru 8 section boilers are shipped with the internal harness length suitable for an 8 section boiler. To modify harness for a 7 section, cut nylon wire tie A; for a 6 section, cut A & B; for 5 section, cut A, B & C; and for a 4 section, cut A, B, C & D. Refer to Table IX and Figure 25.

b.9 thru 13 section boilers are shipped with the proper harness length suitable for a 13 section boiler. For boiler sizes 9 thru 12, modify harness per Table IX, also refer to Figure 25.

c.14 thru 18 section boilers are shipped with the proper harness length suitable for an 18 section boiler. For boiler sizes 14 thru 17, modify harness per Table IX, also refer to Figure 25.

Figure 25: Internal Wiring Harness - Length Adjustment for Penetration Through Side of Jacket Front Panel

42

Page 42
Image 42
Burnham FM01FD00B manual