Burnham FM01FD00B manual Install 2nd Pass Flueway Baffles

Models: FM01FD00B

1 108
Download 108 pages 28.47 Kb
Page 49
Image 49

Lift door high enough to move hinge pockets through opening in jacket front panel. Engage hinge loop attached to door over hinge pin attached to block assembly. Lower door to rest weight on hinge pin brackets.

M.Locate Flueway Baffle Carton(s) marked ‘2FB’ and

‘3FB’ and remove contents. Check Equipment Check

List for proper baffle length and usage per boiler size.

1.On 4 thru 11 Section Boilers - Install four (4) third pass baffles into third pass flueways until handle is flush with face of casting as shown in Figure 32,

Detail A.

2.On 4 thru 18 Section Boilers - Install four (4) second pass baffles into second pass flueways until handle is flush with face of casting as shown in Figure 33,

Detail A.

Figure 32: Install 3rd Pass Flueway Baffles (4 thru 11 Section Boilers Only)

Figure 33: Install 2nd Pass Flueway Baffles

49

Page 49
Image 49
Burnham FM01FD00B manual Install 2nd Pass Flueway Baffles