Cabletron Systems SEHI-22FL Attach the fiber labeled 2 to the applicable TX port on the module

Models: SEHI-22FL

1 85
Download 85 pages 32.83 Kb
Page 38
Image 38
3.Attach the fiber labeled 2 to the applicable TX port on the module.

Chapter 5: Connecting to the Network

Connect a fiber optic link segment to an EPIM-F1, EPIM-F2, or an EPIM-F3 as follows:

1.Remove the protective plastic covers from the fiber optic ports on the applicable port on the module and from the ends of the connectors on each fiber strand.

2.Attach the fiber labeled 1 to the applicable RX port on the module. See Figure 5-3.

3.Attach the fiber labeled 2 to the applicable TX port on the module.

4.At the other end of the fiber optic cable, attach the fiber labeled 1 to the transmit port of the device.

5.Attach the fiber labeled 2 to the receive port.

6.Check that the EPIM LNK LED is on. If the LED is off, perform the following steps until it is on:

a.Check that the power is on for the device at the end of the link.

b.Verify that the fiber strands are properly crossed over between the applicable port on the module and the fiber optic device at the other end of the fiber optic link segment.

c.Verify that the fiber connection meets the dB loss specifications outlined in fiber optic network requirements.

If a link is not established, contact Cabletron Systems Technical Support.

5-6

SEHI User’s Guide

Page 38
Image 38
Cabletron Systems SEHI-22FL manual Attach the fiber labeled 2 to the applicable TX port on the module