Cabletron Systems SEHI-22FL manual Connecting an AUI Cable to an EPIM-X, ON Position, Toward Back

Models: SEHI-22FL

1 85
Download 85 pages 32.83 Kb
Page 43
Image 43
5.1.6Connecting an AUI Cable to an EPIM-X

Connecting the SEHI to the Network

5.1.6Connecting an AUI Cable to an EPIM-X

The Signal Quality Error (SQE) switch remains in the OFF

!position for most network connections. However, some Data

C AUT IO N Terminal Equipment (DTE) requires SQE. Refer to a DTE manual for SQE requirement information.

Perform the following steps to connect an EPIM-X to a device not requiring SQE:

1.Check that the SQE LED on the EPIM-X is off. If the SQE LED is on, check the position of the SQE switch.

NOTE

If the SQE light remains on, even though the SQE switch is in the OFF position, contact Cabletron Systems Technical Support.

2.Attach one end of an AUI cable of up to 50 meters in length to the port located on the EPIM-X (Figure 5-6) and connect the other end to the intended node.

ON Position

 

ON

(Toward Back

 

of EPIM)

 

OFF Position

(Toward Front

of EPIM)

OFF

1490_18

Figure 5-6 The EPIM-X

SEHI User’s Guide

5-11

Page 43
Image 43
Cabletron Systems SEHI-22FL manual Connecting an AUI Cable to an EPIM-X, ON Position, Toward Back, of EPIM