Platform Furnace Support
Construct working platform at location where all required furnace clearances are met. (See Fig. 2 and 17.) For furnaces with
Roll-Out Protection
Provide a minimum
The bottom closure panel on furnaces of widths
58CT | mm) and larger may be used for flame | |
bottom of furnace is used for return air connection. See Fig. 17 | ||
for proper orientation of | ||
| ||
| Bottom Return Air Inlet |
These furnaces are shipped with bottom closure panel installed in bottom
1.Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)
2.Rotate bottom filler panel downward to release holding tabs.
3.Remove bottom closure panel.
4.Reinstall bottom filler panel and screws.
Side Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom
| A |
| PLENUM |
| OPENING |
B | D |
| FLOOR |
| OPENING |
| C |
A96283
Fig. 11 - Floor and Plenum Opening Dimensions
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW |
SUBBASE |
SHEET METAL |
PLENUM |
FLOOR |
OPENING |
A96285
Fig. 12 - Furnace, Plenum, and Subbase installed on a
Combustible Floor
FURNACE
APPROVED
COIL ASSEMBLY
OR
COIL BOX
COMBUSTIBLE |
FLOORING |
SHEET METAL |
PLENUM |
FLOOR |
OPENING |
A08556 |
Fig. 13 - Furnace, Plenum, and Coil Assembly or Coil Box
Installed on a Combustible Floor
12