5 CONNECT SECOND OPERATOR TO CONTROL BOARD (MODEL LA412-S ONLY)

• Before digging, contact local underground utility locating companies.

• Trench across driveway to bury the extension cable.

• Use PVC conduit to prevent damage to cables.

• Select hole in bottom of the control box to be used for the extension cable.

• Insert extension cable through watertight connector nut and through an available watertight connector mounted in the control box.

• Extend cable and wires to Gate 2 connector and connect as shown.

• Secure extension cable to control box using watertight connector nut.

To AVOID damaging gas, power or other underground utility lines, contact underground utility locating companies BEFORE digging.

 

ACCESSORY

R9Ø

 

 

 

POWER

 

 

 

 

24V

 

 

 

Brown

 

 

 

Control Box

Green

BRN

 

 

 

GRN

 

 

 

White

 

10A 32V

Terminal blocks

 

 

Yellow

WHT

 

 

can be removed to

Blue

YEL

 

 

simplify wiring.

BLU

 

 

 

Red

 

 

 

RED

 

 

 

 

 

 

 

 

GATE 2

 

 

 

 

R4 C2

R196

Operator

Extension Cable

 

D15

 

 

 

 

24 VAC/

Cable

 

 

SOLAR

 

PVC Conduit

 

 

 

 

Junction

Box

Extension Cable

PVC conduit at least 18" below

Gate Operator (Gate 2)

Solar Panel

(facing South)

Gate Operator (Gate 1)

Control Box

PVC conduit (not provided) to protect the power cable for solar panel and low voltage wire from lawn mowers and string trimmers.

ground level (grade)

Wiring

24