Manuals
/
Brands
/
Baby
/
Safety Gate
/
Chamberlain
/
Baby
/
Safety Gate
Chamberlain
LA412, LA412-S
TEMPLATE FOR POST BRACKET MOUNTING
1
48
48
Download
48 pages, 7.95 Mb
TEMPLATE FOR POST BRACKET MOUNTING
1
2
3
4
5
6
7
6
5
4
3
2
1
7
© 2008, The Chamberlain Group, Inc.
01-34491B
All Rights Reserved
Contents
Models LA412 and LA412-S
For Residential Use Only
■Please read this manual and the enclosed safety materials carefully
■The model number label is located inside the control box of your operator
■Serial #
TABLE OF CONTENTS
2-7INTRODUCTION
8-12PREPARATION AND OVERVIEW
12-21INSTALLATION
21-22WIRING
Operator Dimensions and Specifications
SAFETY INSTALLATION INFORMATION
Page
Carton Inventory
Hardware Inventory
Additional Items For Purchase
Tools Needed
OVERVIEW OF TYPICAL INSTALLATION
Dual Gate Typical Installation
Check Your Gate
Mounting Options
LEFT-HANDHINGE MOUNTED
RIGHT-HANDHINGE MOUNTED
INSTALLATION
Left-HandGate
3 MEASURING AND MARKING FOR THE GATE BRACKET
closed
closed
Template Method
Tape Measure Method
POSITION THE EXTENSION BRACKET TO POST BRACKET
DO NOT TIGHTEN AT THIS TIME
5 ATTACH BRACKETS TO GATE OPERATOR
6POSITION GATE OPERATOR ON GATE
The gate operator (arm) must be level
open
CLOSE AS POSSIBLE
Page
SECURE POST BRACKET TO GATE POST
10SECURE GATE BRACKET TO GATE
If installing a 2nd operator, repeat installation steps 1-11for the second
gate before proceeding to the next page
13MOUNT THE CONTROL BOX
Open the Control Box
Remove the Control Board
Select Mounting Holes
MOUNT THE CONTROL BOX (CONTINUED)
14 INSTALL THE CONTROL BOARD
WIRING
Connect the Gate Operator (Gate 1) to the Control Box
3CONNECT THE OPERATOR TO THE CONTROL BOARD
If installing one operator, proceed to page
If installing two operators, continue to the next page
Connect the Gate Operator (Gate 2) to the Control Box (Model LA412-SOnly)
5 CONNECT SECOND OPERATOR TO CONTROL BOARD (MODEL LA412-SONLY)
6JUNCTION BOX
CONNECT WATERTIGHT CONNECTORS
CONNECT WIRES IN JUNCTION BOX
SECURE JUNCTION BOX
SOLAR PANEL INSTALLATION
Select Site for Solar Panel(s)
1 OVERVIEW OF SOLAR PANEL INSTALLATION
due south
TIP:
POSITION SOLAR BRACKET
INSERT MOUNTING BOLTS
SECURE SOLAR PANEL(S) TO SOLAR BRACKET
MOUNT SOLAR PANEL(S) ASSEMBLY
AC PWR/SOLAR
diagnostic
8 CONNECT BATTERIES
PROGRAMMING
Program Limits
DUAL GATE (LEFT-SIDEPRIMARY OPERATOR)
DUAL GATE (RIGHT-SIDEPRIMARY OPERATOR) PROGRAM OPEN
SET CLOSE LIMITS
Force and Timer to Close
To Add or Reprogram a Remote Control (not provided)
To Add a Wireless Keyless Entry (not provided)
To Erase All Codes
OPERATION AND MAINTENANCE
USING YOUR GATE OPERATOR
MANUAL RELEASE
MAINTENANCE
Wiring Diagram
Diagnostic Chart
Troubleshooting
Page
Page
REPAIR PARTS
Control Box
Gate Operator Arm
ACCESSORIES
WARRANTY POLICY
Page
TEMPLATE FOR POST BRACKET MOUNTING