C H A P T E R 2
Preparing to Install the Router
This chapter describes site requirements and equipment needed to install your Cisco MWR 1900 router. It includes the following sections:
•Safety Recommendations, page
•General Site Requirements, page
•Installation Checklist, page
•Console and Auxiliary Port Considerations, page
•Inspecting the Router, page
•Required Tools and Equipment for Installation and Maintenance, page
•Console and Auxiliary Port Considerations, page
Safety Recommendations
Follow these guidelines to ensure general safety:
•Keep the chassis area clear and
•Keep tools away from walk areas where you or others could fall over them.
•Do not wear loose clothing that may get caught in the chassis. Fasten your tie or scarf and roll up your sleeves.
•Wear safety glasses when working under conditions that may be hazardous to your eyes.
•Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.
Warning Only trained and qualified personnel should be allowed to install or replace this equipment.
Cisco MWR 1900 Mobile Wireless Edge Router Hardware Installation Guide
|
| ||
|
|