Contents

 

Console and Auxiliary Port Considerations

2-6

 

 

 

Console Port Connections

2-6

 

 

 

 

 

 

Auxiliary Port Connections

2-6

 

 

 

 

 

 

Installing the Router

 

 

 

 

 

 

 

 

C H A P T E R 3

3-1

 

 

 

 

 

 

 

 

Rack Mounting the Chassis

3-1

 

 

 

 

 

 

 

Attaching the Brackets

3-2

 

 

 

 

 

 

Installing the Router in the Rack

 

3-2

 

 

 

 

Installing a T1/E1 Multiflex VWIC

3-2

 

 

 

 

Connecting the Console Terminal and Modem 3-2

 

 

 

Identifying a Rollover Cable

3-3

 

 

 

 

 

Console Port

3-3

 

 

 

 

 

 

 

 

Auxiliary Port

3-4

 

 

 

 

 

 

 

 

Connecting the Network Cables

3-4

 

 

 

 

 

Connecting the FE Interface Cables

3-4

 

 

 

Connecting the VWIC Interface Cables

3-5

 

 

 

Connecting the MWR 1900 Router to a DC-Input Power Supply 3-7

 

Required Tools and Equipment

3-7

 

 

 

 

Grounding the Router

3-8

 

 

 

 

 

 

 

Wiring the DC-Input Power Source

3-9

 

 

 

Powering On the Router

3-9

 

 

 

 

 

 

Replacing or Upgrading the CF

3-10

 

 

 

 

 

Removing a CF Memory Card from an External Slot

3-11

 

Installing a CF Memory Card in an External Slot

3-11

 

Formatting Procedures for CF Memory Cards

3-12

 

 

File and Directory Procedures

3-12

 

 

 

 

What to Do After Installing the Hardware

3-16

 

 

 

Troubleshooting A-1

 

 

 

 

 

 

 

A P P E N D I X A

 

 

 

 

 

 

 

 

Problem Solving

A-1

 

 

 

 

 

 

 

 

Troubleshooting the Power and Cooling Systems

A-2

 

Environmental Reporting Features

A-2

 

 

 

Troubleshooting Modules, Cables, and Connections

A-3

 

Reading the LEDs

A-3

 

 

 

 

 

 

 

I N D E X

Cisco MWR 1900 Mobile Wireless Edge Router Hardware Installation Guide

 

iv

78-13982-02

 

 

 

Page 4
Image 4
Cisco Systems MWR 1900 manual Console Port Connections, Grounding the Router, What to Do After Installing the Hardware