Cisco Systems OL-16146-10 manual Removing a Mylar Tab SFP Module

Models: OL-16146-10

1 136
Download 136 pages 22.09 Kb
Page 116
Image 116

Chapter 5 Installing and Removing SFP and XFP Modules

Removing and Installing SFP Modules

Step 2

Close the bale clasp before inserting the SFP module.

 

 

 

 

Step 3

Line up the SFP module with the port and slide it into the port. (See Figure 5-3.)

 

 

 

Figure 5-3

Installing a Bale Clasp SFP Module into a Port

 

 

 

 

 

 

7600-

 

 

 

 

 

 

ES+20G3CXL

 

 

 

 

 

 

1

3

 

 

 

 

 

 

5

 

 

 

 

 

 

7

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

EXT

 

 

 

 

 

 

CLK

 

 

 

 

 

 

2

4

 

 

 

 

 

 

6

 

 

 

 

 

 

8

 

 

 

 

 

 

10

 

 

 

 

 

 

280864

Note Verify that the SFP modules are completely seated and secured in their assigned receptacles on the line card by firmly pushing on each SFP module. If the SFP module is not completely seated and secured in the receptacle, you will hear a click as the triangular pin on the bottom of the SFP module snaps into the hole in the receptacle.

Mylar Tab SFP Module

The mylar tab SFP module has a tab that you pull to remove the module from a port. (See Figure 5-4.)

Figure 5-4 Mylar Tab SFP Module

63065

Removing a Mylar Tab SFP Module

To remove this type of SFP module, follow these steps:

Step 1 Attach an ESD-preventive wrist or ankle strap and follow its instructions for use.

Cisco 7600 Series Ethernet Services Plus Line Card Hardware Installation Guide

5-4

OL-16146-10

 

 

Page 116
Image 116
Cisco Systems OL-16146-10 manual Removing a Mylar Tab SFP Module