Chapter

Preparing for Component Installation

This section describes how to prepare the server for component installation or replacement and includes the following topics:

Required Equipment, page 3-7

Shutting Down and Powering Off the Server, page 3-8

Removing and Replacing the Server in a Rack, page 3-9

Removing and Replacing the Server Top Cover, page 3-10

Removing and Replacing the Server Front Cover, page 3-11

Replaceable Component Locations, page 3-12

Warning Only trained and qualified personnel must be allowed to install, replace, or service this equipment.

Statement 1030

Warning This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the two power supply cords before servicing the unit. Statement 14

Required Equipment

The following items are used to perform the procedures in this chapter:

Number 1 Phillips-head screwdriver

Number 2 Phillips-head screwdriver

Needle-nose pliers

Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat.

Cisco UCS C210 Server Installation and Service Guide

 

OL-20887-02

3-7

 

 

 

Page 45
Image 45
Cisco Systems UCS C210 manual Preparing for Component Installation, Required Equipment