Cisco Systems WS-SVC-CMM manual Clearing the EMI Gasket in a Horizontal Slot Chassis

Models: WS-SVC-CMM

1 36
Download 36 pages 21.6 Kb
Page 12
Image 12

Installing and Removing the CMM

Figure 6 Clearing the EMI Gasket in a Horizontal Slot Chassis

 

WS-X6K-SUP2-2GE

 

 

1

CONSOLE

 

 

 

 

PORT

 

CONSOLE

MODE

 

SUPERVISOR2

 

 

WS-X6K-SUP2-2GE

 

 

2

CONSOLE

 

 

 

 

PORT

 

CONSOLE

MODE

 

SUPERVISOR2

 

 

3

 

Press down

 

 

4

 

FAN

WS-X6224

 

STATUS

5

 

 

24 PORT 100FX

 

 

6

 

 

3

 

4

4

 

 

 

 

Switch

Load

 

 

100%

 

 

 

 

PORT 1

PORT 2

PCMCIA

EJECT

 

 

 

1%

 

 

 

Switch

Load

 

 

100%

 

 

 

 

PORT 1

PORT 2

PCMCIA

EJECT

 

 

 

1%

 

 

Press down

SELECT

NEXT

 

WS-C6500-SFM

5

5

 

 

SWITCH

 

FABIRD MDL

6

6

 

STATUS

ACTIVE

1 mm Gap between the module EMI gasket and the module above it

58570

b.Using the thumb and forefinger of each hand, grasp the two ejector levers and press down to create a small (0.040 inch [1 mm]) gap between the EMI gasket and the module above it. (See Figure 6.)

Caution Pressing down too firmly on the levers will bend and damage them.

c.While pressing down, simultaneously close the left and right ejector levers to fully seat the module in the backplane connector. The ejector levers are fully closed when they are flush with the module faceplate. (See Figure 7.)

Catalyst 6500 Series Switch and Cisco 7600 Series Router CMM Installation and Verification Note

12

78-14107-07

 

 

Page 12
Image 12
Cisco Systems WS-SVC-CMM manual Clearing the EMI Gasket in a Horizontal Slot Chassis