CSBBYMV Operation Sequence
Single Operator. Refer to Figure 4.
A typical single operator shirt station consists of:
●One CSBBYMV sleeve, bosom, body and yoke press
●One collar and cuff press (CUCC)
●One collar post
●One damp box
To increase operator productivity (with less fatigue) position the items listed above as shown in Figure 4.
Set timers as follows:
●Steam timer – 5 seconds
●Cycle timer – 35 seconds (100% cotton)
●Cycle timer – 25 seconds (Blends)
NOTE: Pressing and steam times may vary based on:
●Steam pressure at the press. Ideally, steam pressure at press should be
●Shirt fabric (100% cotton, blends, etc.).
●Fabric thickness and weight.
●Moisture retention in shirts should be 40% to 50%.
The sequence begins by removing a shirt from the damp box and dressing it on the collar and cuff press. As this shirt progresses COUNTERCLOCKWISE through the station, other shirts will also be introduced until there is a shirt at the collar post, the CSBBYMV and the CUCC. The operator will then move in a CLOCKWISE direction to keep shirts in all three operations simultaneously.
The operation sequence for the CSBBYMV is:
1.Load shirt 1 from damp box onto CUCC.
2.Unload CUCC. Hang shirt 1 on garment hook.
3.Load shirt 2 from damp box onto CUCC.
4.Load shirt 1 from garment hook onto buck.
Operation
5.Unload CUCC. Hang shirt 2 on garment hook.
6.Load shirt 3 from damp box onto CUCC.
7.Remove shirt 1 from buck. Place on collar post. Form collar and button. Leave shirt on collar post to cure.
8.Load shirt 2 from garment hook onto buck.
9.Unload CUCC. Hang shirt 3 on garment hook.
10.Load shirt 4 from damp box onto CUCC.
11.Hang shirt 1 from collar post on finished rack.
12.Unload shirt 2 from buck. Place on collar post. Repeat steps 7 through 12.
2
1
3
5
4
TYPICAL CSBBYMV LAYOUT
CAB416N
1Collar Post
2CSBBYMV
3CUCC
4Damp Box
5Operator
Figure 4
AJ0975 | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | 13 |