Crane Merchandising Systems 6530006 manual Hot Drink Center Set-Up Manual, Water Requirements

Models: 6530006 Hot Drink Center

1 58
Download 58 pages 28.19 Kb
Page 20
Image 20
Water Requirements

Hot Drink Center Set-Up Manual

Water Requirements

The best type of water for coffee brewing is normal hard (tap) water. If your location has chemically softened water, you should do one of the following things:

Have a non-softened supply line run to the merchandiser

Contact your local water filter supplier for information and suggestions

Well water can also be used in the Hot Drink Center. However, you should have it checked for levels of carbonates and alka- lies. Contact your water filter supplier if these values are rela- tively high.

What is the Water Pressure at Your Location?

It should be no less than: 10 psi ( 69.0 KPa) at 1/2 gallon/minute

And no more than: 80 psi (522.0 KPa) at 1/2 gallon/minute

If you're not sure about the pressure and flow rate, check with your water com- pany.

What to do With the Water Supply Line:

Locate the supply line at the rear of your merchandiser.

Equip the line with a shut-off valve.

Flush the water supply line before connecting it to the merchandiser. A mini- mum of five gallons is usually required before connecting the merchandiser to the supply line. DO NOT flush the merchandiser water system. If you do, you might introduce water line contaminants into the merchandiser.

16

6530006

 

March, 2001

Page 20
Image 20
Crane Merchandising Systems Hot Drink Center Set-Up Manual, Water Requirements, What to do With the Water Supply Line