Crane Merchandising Systems Hot Drink Center Set-Up Manual, Install the Optional Coin Box Lock

Models: 6530006 Hot Drink Center

1 58
Download 58 pages 28.19 Kb
Page 30
Image 30
2.Install the Optional Coin Box Lock

Hot Drink Center Set-Up Manual

m.Place the main power switch in the ON position.

n.Test the brewer to be sure the paper feeds properly:

1.

On the maintenance keypad, press

, then press

until

 

the display shows BREW TEST.

 

 

2.

Press

to test each brewer position:

 

WARNING

Keep away from the brewer mechanism while it is operating. Coming into contact with moving parts could injure you.

BREW 'R BREW The brewer is in the BREW POSITION.

BREW 'R FLIP The brewer is in the FLIP position.

BREW 'R HOME The brewer is in the HOME position.

3. Make sure the filter paper feeds properly without jamming. o. Replace the cup station and grounds bucket.

2.Install the Optional Coin Box Lock

a.Install the lock cylinder, washer, and nut in the order shown.

b.Tighten the nut.

c.Install the lock bar as shown, and secure with the screw.

LOCK BAR

SCREW

 

NUT

LOCK

WASHER

CYLINDER

 

3.Load the Coin Mechanism

a.Open the cabinet door and the monetary door.

b.Insert coins into their respective tubes until each tube has been filled.

c.Inspect the tubes for shingled coins and correct if necessary.

26

6530006

 

March, 2001

Page 30
Image 30
Crane Merchandising Systems Hot Drink Center Set-Up Manual, Install the Optional Coin Box Lock, Load the Coin Mechanism