SS7AM1 Programmer’s Manual Issue 7

for SS7 serial interface ports 38 SS7 serial interface port

location of 36

see also "V.11 (V.35-compatible) ports" specifications 16

splitter cable 38 SS7 signaling boards

capabilities of 12, 31 installing or replacing 64 location of in chassis 62, 65 part numbers 80

SPCI boards

preparing for installation 62 SS7HDP boards

preparing for installation 63 SS7G20SHDD

backing up the system configuration 56 replacing 55

replacing the hardware 56

restoring the system configuration 57 SS7G21

Declaration of Conformity 23 location of major components 61 physical specifications 19 product overview 11 reliability calculations 19

SS7G22

Declaration of Conformity 24 location of major components 61 physical specifications 19 product overview 11 reliability calculations 19

SS7HDP boards

installing or replacing 64 preparing to install 63

switches

power switch 17 reset switch 17

unit identification switch 18

T

telecommunications compliance

installation actions 26, 28 specifications 22, 27

temperature range 19 TNV-1 7, 29, 87

tools and equipment 47 top cover

removal of 59, 60

V

V.11 (V.35-compatible) ports

cabling for 83 clocking 85 configuration 85 connecting to 28, 83 connector pinouts 37 specifications 16

ventilation 10, 13

W

Warnings

class A 28

for service personnel 43 for users 7 international 69–78

when working inside the product 59

91

Page 91
Image 91
Dialogic SS7G22, SS7G21 manual Switches