Manuals
/
Enterasys Networks
/
Computer Equipment
/
Switch
Enterasys Networks
2200
manual
Models:
2200
1
16
62
62
Download
62 pages
7.22 Kb
13
14
15
16
17
18
19
20
Troubleshooting
Specs
Install
Connecting Power
Using the Reset Button
Lanview Diagnostic LEDs
Setting the Mode Switches
Simm Upgrade
Full Duplex Switched Ethernet
Using this Guide
Page 16
Image 16
Page 15
Page 17
Page 16
Image 16
Page 15
Page 17
Contents
2H258-17R SmartSwitch Installation User’s Guide
Page
FCC Notice
Vcci Notice
Industry Canada Notice
Class a ITE Notice Bsmi EMC Statement Taiwan
Enterasys NETWORKS, INC Program License Agreement
You and Enterasys agree as follows
Page
Page
Declaration of Conformity
Contents
Troubleshooting
Figures
Tables
About This Guide
Using this Guide
Structure of this Guide
Related Documents
Document Conventions
This guide uses the following conventions
Page
Introduction
Overview
Connectivity
Runtime IP Address Discovery
SmartTrunk
Full Duplex Switched Ethernet
Remote Monitoring Rmon
Port/VLAN Redirect Functions
Broadcast Suppression
Traffic Rate Limiting
Flow Control
Garp Switch Operation
11 802.1 Port Priority
Switching Options
Management
Optional HSIMs and VHSIMs
Standards Compatibility
Lanview Diagnostic LEDs
Getting Help
Page
Network Requirements
100BASE-FX Network
Page
Installation
Installing Options
Unpacking the Device
Installing the Device
Tabletop or Shelf Installation
Rackmount Installation
Guidelines for the Rackmount Installation
Strain-Relief Bracket Screws
Rack Mounting the 2H258-17R
Connecting Power
Installing the Device in a Rack
Connecting to the Network
Redundant Primary AC outlets are On separate circuits
Connecting to the Network
Fiber Optic Connection
Completing the Installation
Page
Troubleshooting
Using Lanview
PWR
CPU
Troubleshooting Checklist
OFF
Refer to the SmartSwitch Series 2E253
2E253, 2H252, 2H253, and 2H258 Local
User parameters
Using the Reset Button
Reset Button
Device Specifications
Specifications
Physical Properties
Environmental Requirements
Electrical Specifications
INPUT/OUTPUT Ports
COM Port Pinout Assignments
Regulatory Compliance
Page
Optional Installations Mode Switch Bank Settings
Required Tools
Removing the Chassis Cover
Optional Installations and Mode Switch Bank Settings B-3
Figure B-1 Removing the Chassis Cover
Setting the Mode Switches
Figure B-2 Mode Switch Location
6Optional Installations and Mode Switch Bank Settings
Simm Upgrade
Locating SIMMs
Installing the Dram Simm
Installing Optional Hsim or Vhsim Interface Modules
Figure B-5 Hsim and Vhsim Connector Locations
Page
Index
Numerics
Index-2
Top
Page
Image
Contents