Manuals
/
Enterasys Networks
/
Computer Equipment
/
Switch
Enterasys Networks
2200
manual
Models:
2200
1
50
62
62
Download
62 pages
7.22 Kb
47
48
49
50
51
52
53
54
Troubleshooting
Specifications
Install
Connecting Power
Using the Reset Button
Lanview Diagnostic LEDs
Setting the Mode Switches
Simm Upgrade
Full Duplex Switched Ethernet
Using this Guide
Page 50
Image 50
Page 49
Page 51
Page 50
Image 50
Page 49
Page 51
Contents
2H258-17R SmartSwitch Installation User’s Guide
Page
FCC Notice
Class a ITE Notice Bsmi EMC Statement Taiwan
Industry Canada Notice
Vcci Notice
Enterasys NETWORKS, INC Program License Agreement
You and Enterasys agree as follows
Page
Page
Declaration of Conformity
Contents
Troubleshooting
Figures
Tables
Structure of this Guide
Using this Guide
About This Guide
Related Documents
Document Conventions
This guide uses the following conventions
Page
Introduction
Overview
Connectivity
Runtime IP Address Discovery
Remote Monitoring Rmon
Full Duplex Switched Ethernet
SmartTrunk
Traffic Rate Limiting
Broadcast Suppression
Port/VLAN Redirect Functions
11 802.1 Port Priority
Garp Switch Operation
Flow Control
Optional HSIMs and VHSIMs
Switching Options
Management
Standards Compatibility
Lanview Diagnostic LEDs
Getting Help
Page
Network Requirements
100BASE-FX Network
Page
Installation
Installing Options
Unpacking the Device
Installing the Device
Tabletop or Shelf Installation
Rackmount Installation
Guidelines for the Rackmount Installation
Strain-Relief Bracket Screws
Rack Mounting the 2H258-17R
Connecting Power
Installing the Device in a Rack
Connecting to the Network
Redundant Primary AC outlets are On separate circuits
Connecting to the Network
Fiber Optic Connection
Completing the Installation
Page
Troubleshooting
Using Lanview
PWR
CPU
Troubleshooting Checklist
OFF
Refer to the SmartSwitch Series 2E253
2E253, 2H252, 2H253, and 2H258 Local
User parameters
Using the Reset Button
Reset Button
Physical Properties
Specifications
Device Specifications
INPUT/OUTPUT Ports
Electrical Specifications
Environmental Requirements
COM Port Pinout Assignments
Regulatory Compliance
Page
Optional Installations Mode Switch Bank Settings
Required Tools
Removing the Chassis Cover
Optional Installations and Mode Switch Bank Settings B-3
Figure B-1 Removing the Chassis Cover
Setting the Mode Switches
Figure B-2 Mode Switch Location
6Optional Installations and Mode Switch Bank Settings
Simm Upgrade
Locating SIMMs
Installing the Dram Simm
Installing Optional Hsim or Vhsim Interface Modules
Figure B-5 Hsim and Vhsim Connector Locations
Page
Index
Numerics
Index-2
Top
Page
Image
Contents