EPSON Stylus PHOTO 810/820/830

Revision B

4.3.4 CR motor removal

1. Remove the Upper housing from the printer. (Refer to Section 4.3.1)

A D J U

†

 

 

R E Q U

 

2.Remove the CR unit from the printer. (Refer to Section 4.3.3)

3.Disconnect the CR motor connector cable from the connector (CN12) on the Main board, and release the CR motor connector cable from five hooks on the LD roller shaft holder.

4.Remove four nots (HEXAGON NOT NORMAL M3) for securing the screw of the CR motor while holding the CR motor by hand.

When the CR motor is removed or replaced with new one, the following adjustment must be performed in the order below.

1)Gap adjustment (Bi-d adjustment)

2)1st dot position adjustment
†When assembling the CR motor to the Main frame,

„Make sure to connect the CR motor connector cable to the connector (CN12) on the Main board.

„Fasten four Hexagon nut (HEXAGON NUT NORMAL M3) for securing the CR motor in the order indicated in the following figure.

HEXAGON NOT, NORMAL, M3

1

4

 

3

2

 

Figure 4-18. CR motor assemblingTightening torque for the CR motor hexagon nut is as follows.• HEXAGON NUT, NORMAL, M3 (4 pcs) : 6 ± 1 kgf.cm„Make sure that the CR motor is correctly fixed.