CUTTING THE VENT TUBES

With the furnace installed on wall the 5" (127 mm) diameter air inlet tube and 3" (76 mm) diameter flue outlet tube are to be marked and cut using the following procedure. After cutting the tubes, each tube should be individually checked for proper length before installing by fitting in place.

3

4

Attach 5" (127 mm) diameter air inlet tube onto the collar of air drop assembly. Be sure 5" (127 mm) diameter air inlet tube is placed as far as possible onto the collar of the air drop assembly. Mark the 5" (127 mm) diameter air inlet tube 1 7/16" (36.5 mm) beyond the mounting surface for the outside wall plate. Remove 5" (127 mm) diameter air inlet tube from collar of air drop assembly.

MARKER

FLUE OUTLET TUBE

COLLAR OF

FLUE OUTLET

Attach 3" (76 mm) diameter flue outlet tube onto flue outlet collar on combustion chamber. Be sure 3" (76 mm) diameter flue outlet tube is placed as far as possible onto the collar of flue outlet. Mark the 3" (76 mm) diameter flue outlet tube 2 7/8" (73.0 mm) beyond the mounting surface for the outside wall plate. Remove 3" (76 mm) diameter flue outlet tube from collar of flue outlet on combustion chamber.

5

Mark or wrap tape completely around the tubes at the marked points to help in making a true cut. Do not crimp or enlarge tubes.

Page 22

24632-0-0508

Page 22
Image 22
Epson HWDV080DV(N, P)-1 installation instructions Marker Flue Outlet Tube Collar