Furuno FSV-30S installation manual Installing hull unit on retraction tank

Models: FSV-30S FSV-30

1 80
Download 80 pages 43.78 Kb
Page 11
Image 11

1.1.4 Installing hull unit on retraction tank

After welding the retraction tank and allowing sufficient time for cooling, install the hull unit as follows:

1.Clean the hull unit flange, the O-ring and O-ring groove. Coat them with a slight amount of grease. Place the O-ring in position on the tank flange.

2.Orient the hull unit so that the bow mark (inscribed) on its flange points toward the ship’s bow. Note that heading adjustment is required if the bow mark is not facing the ship’s bow.

3.Confirm that the O-ring is in position. Place the hull unit on the tank.

4.Coat every washer, nut and bolt with a slight amount of grease to ease removal. Fasten the hull unit to the retraction tank with flat washers, spring washers and hex bolts.

5.Reinforce the hull unit against vibration by extending stays to the ship’s hull from the two eye bolts at the top of the hull unit, referring to the procedure on page 1-7.

1-5

Page 11
Image 11
Furuno FSV-30S installation manual Installing hull unit on retraction tank