2. INSTALLATION

2.3Installing the Processor Unit

The processor unit should be mounted aligned with the ship’s fore-and-aft line. It can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a mounting location which allows you to easily view the power lamp on the top of the unit and which is within ± 2.5° of the ship’s fore-and-aft line.

2.3.1Deck mount

1.The processor unit is factory adjusted for deck mounting. Fasten the processor unit to the mounting location with tapping screws (5 x 20, 4 pcs.). The unit can be oriented in one of the directions shown in the figure below. After the unit is installed you will specify the mounting method from the menu.

Mount processor unit

 

Reference Direction

so reference

 

direction±

is within

 

 

2.5￿of

 

 

POWER switch

fore-and-aft line.

 

Name plate

 

(power lamp)

 

 

 

Connectors

 

 

Processor Unit, top view

 

Bow

 

Bow

 

 

 

 

Mounting Method: "Floor"

Mounting Method: "Floor"

 

 

(Deck)

(Deck)

 

Mounting Direction: A

Mounting Direction: B

Port

Starboard

Port

Starboard

 

 

DIRECTION "A"

 

DIRECTION "B"

 

Stern

 

Stern

 

Bow

 

Bow

 

Mounting Method: "Floor"

Mounting Method: "Floor"

 

 

(Deck)

(Deck)

 

Mounting Direction: C

Mounting Direction: D

Port

Starboard Port

Starboard

DIRECTION "C"

DIRECTION "D"

Stern

Stern

 

Processor unit orientation, deck mounting

2.Fasten the ground wire between the ground terminal on the processor unit and the ship’s superstructure.

2-9

Page 23
Image 23
Furuno SC-120 manual Installing the Processor Unit, Deck mount, Processor unit orientation, deck mounting