Form #43343530 July 08
Typical Assembly Overview
(PTS 40FT Shown)
Turbulator
(See specifications section 5 for required quantities.)
Typical
Overlap
Flue
Termina
8.2) HEATER ASSEMBLY
|
|
| |
|
|
| 5/16" Hex Nuts |
|
| 4"OD x 10Ft. Tube |
|
|
| See section 7 |
|
|
| for required tubes. |
|
| Mounting Flange | 8’ - 10’ | |
| 24 Hole for Aluminized Steel Tubes | ||
|
| ||
Burner |
| 6 Hole for | |
| 8’ - 9’ ¼” |
| |
Box | Gasket |
|
Maximum 6” distance from burner box to the tube support/hanger bracket.
Wire Hanger
Tube Support Bracket
Tube Coupling
(Typical each tube joint.) 8’ - 10’
#10
Not Less
Than 10”
/ JOINING OF TUBE SECTIONS
Burner Box
Suspension
Chain
5 hanging points to be used for suspension for a typical 40ft long system. There must be two hanging points on the first tube and one on each of the other tubes