Turbulators

MODEL

2 Ft. Turbulator Sections

PTS/U 40/25

4

PTS/U 50/30

5

PTS/U 75/50

5

PTS/U 100/65

3

PTS/U 125/80

7

PTS/U 150/100

4

PTS/U 175/110

0

PTS/U 200/125

1

ASSEMBLY HAZARD

The PTS / U 40 has one stainless steel turbulator. This must be installed closest to the burner.

Failure to do so may result in deterioration of the turbulator material and invalidate the warranty.

10.3) ADDING REFLECTORS

1.Slide the reflectors on the tube support/hanger brackets and through the wire hangers.

2.The tube at the coupling joints must be covered. Slide the reflectors together and provide an overlap of two (2”) inches for the first reflector overlap after the control unit. All remaining reflector overlaps will be approximately one (1”) inch. This will allow for the natural expansion and contraction of the heater when in operation. Note: The heaters can expand and contract up to 1-3/4” of an inch.

3.Secure the reflectors as shown in Detail “A” using #10 x 1/2” self-drilling sheet metal screws at each tube support/hanger bracket.

40 FT SYSTEM SHOWN

The reflector overlap must be able to slide at this joint for expansion of the heater

3” Gap (between burner box and reflector)

1” OVERLAP

 

 

2” OVERLAP

Burner Box

 

 

Suspension

REFLECTOR

DETAIL “B”

Chain

 

 

BURNER

DETAIL “A”

 

BOX

 

 

 

DETAIL “B”

REFLECTOR

REFLECTOR

OVERLAP

OVERLAP

(offset from tube

(positioned over tube

hanger support brackets)

hanger support brackets)

FLUE

TERMINAL

1” OVERLAP

DETAIL “A”

 

 

#10 x 1/2” SHEET

 

 

METAL SCREW

 

 

(Typical all tube

CORRECT INSTALLATION

INCORRECT INSTALLATION

hanger/

support brackets.)

Form #43343530

 

 

July 08

–21–

 

Page 22
Image 22
Gas-Fired Products 175, N7/L7, 100, 40, 150, 200 manual Adding Reflectors, Ft. Turbulator Sections