GE DH2000 Electrical Connections, Three Phase Operation, Refer to the next page for 3-phase to

Models: DH2000

1 44
Download 44 pages 62.8 Kb
Page 12
Image 12
Electrical Connections

Installation

Electrical Connections

Three Phase Operation

ATTENTION

WARNING:

Electrocution or serious injury may result when working on an energized circuit.

Disconnect power at the main breaker or service disconnect switch before working on the circuit.

Lock-out and tag the breaker to indicate that work is being performed on the circuit.

A qualified electrician must connect the main incoming power to the dishwasher in accordance with all local codes and regulations or in the absence of local codes in accordance with the National Electrical Code.

Standard Dishwashers are shipped from the factory for 3-phase operation.

To connect the dishwasher for 3-phase operation:

1.Remove the top-mounted control cabinet cover and locate the main terminal block in the left-rear corner of the cabinet.

2.Refer to the Machine Electrical Connection Data Plate located near the main terminal block and make sure that the incoming power supply matches the machine's electrical requirements.

3.Connect the incoming 3-phase power as shown in the illustration to the right.

4.Re-install the control cabinet cover.

NOTE:

Refer to the next page for 3-phase to

1-phase field conversion instructions.

Main Terminal Block

Main Terminal Block Location

THREE PHASE

POWER CONNECTION

208-240V/60/3

LINE IN

L1 L2 L3

GRD

4

Page 12
Image 12
GE DH2000 Electrical Connections, Three Phase Operation, Refer to the next page for 3-phase to, Installation