GE DH2000 Field Conversion from 3-phase to 1-phase Operation, Installation Electrical Connections

Models: DH2000

1 44
Download 44 pages 62.8 Kb
Page 13
Image 13
Installation

Installation

Electrical Connections

Field Conversion from 3-phase to 1-phase Operation

A standard 3-phase operation dishwasher can be converted for

1-phase operation with the installation of a jumper wire on the main terminal and rewiring of the wash tank and booster tank heaters.

A jumper wire, jumper bars and a new data plate are stowed on top of the wash tank heater junction box.

To convert the dishwasher from 3-phase to 1-phase operation:

Install Main Terminal Block Jumper Wire

1.Disconnect all power to the machine.

2.Remove the top-mounted control cabinet cover and locate the main terminal block located in the left-rear corner of the cabinet.

3.Connect the jumper wire (shipped inside the control cabinet) between L2 and L3 on the output side of the main terminal block.

4.Connect the 1-phase incoming power supply to L1 and L2 on the input side of the main terminal block.

Rewire Wash Tank Heater Element for 1PH

1.Remove the lower front panel.

2.Remove the wash tank heater junction box cover.

3.Remove the paper insulator and jumper bars from the heater terminals.

4.Additional short jumper bars are stowed with the new data plate.

5.Reposition the jumper bars for 1PH as shown below.

6.Connect the #33 wire to one element terminal as shown.

7.Connect the #34 and #35 wires to the other terminals as shown.

8.Reinstall the paper insulator and the junction box cover.

SINGLE PHASE

POWER CONNECTION

208-240V/60/1

LINE IN

GRD L1 L2

L1

L2

L3

JUMPER

Connect the jumper wire between L2 and L3 on the output side of the main terminal block

 

L1

 

 

 

33

 

L1

 

L2

 

 

34

 

33

3PH

L3

 

L2

35

 

 

1PH

L3

34

 

 

35

 

Rewire Booster Heater Element for 1PH

1.Remove the booster heater element cover.

2.Remove the paper insulator and jumper bars from the heater terminals.

3.Install the jumper bars for 1PH as shown below.

4.Additional short jumper bars are stowed with the new data plate.

5.Connect the #36 wire to one element terminal as shown.

6.Connect the #37 and #38 wires to the other terminals as shown.

7.Reinstall the paper insulator and the booster heater element cover.

3PH

L3

1PH

 

38

 

37

36

38

 

36

L2

L1

 

 

 

 

 

 

L3

37

L1

 

 

 

L2

 

NOTE: The additional jumper bars needed for 1PH operation are stowed with the new data plate on top of the wash tank heater junction box.

ATTENTION:

Affix the new data plate on top of the existing machine data plate to complete the conversion.

5

Page 13
Image 13
GE DH2000 operation manual Field Conversion from 3-phase to 1-phase Operation, Install Main Terminal Block Jumper Wire