Chapter

2

Powerup and Software Installation

This chapter contains information you need to set up your Panel C industrial computer’s operating system and network communications.

Setup

Before you attempt to power up the system for the first time, inspect the unit for loose or damaged components. Remove the top cover and make sure there are no loose or damaged assemblies. Applying power to a system with damaged components may cause additional damage.

Initial Startup Procedure

Warning

Installation of the Panel C industrial computer in hazardous locations requires the use of a cable mounting clamp with the power connector.

Caution

Do not connect or disconnect external devices, such as a printer, keyboard or a mouse while the unit is powered on. Failure to observe this precaution could result in damage to the equipment.

1.Plug the power cable into the unit’s power connector and connect to the power source.

2.Plug in the serial/parallel data transfer cables and screw the plugs to the connectors.

3.Power up the unit and check whether any concealed damage has been caused by incorrect transportation, incorrect operating/storage conditions or incorrect handling (e.g. smoke coming out of the unit, etc.). If you notice any damage, remove power from the unit immediately and secure it against unintentional use.

During power up, the processor runs its normal diagnostic checks and indicates the presence of any errors with screen prompts .

GFK-2251

2-1

Page 16
Image 16
GE GFK-2251 manual Chapter Powerup and Software Installation, Setup