Chapter

3

GFK-2023C

Installation

Intelligence Panel PCs are designed for installation in switchboard panels and cabinet doors. To facilitate installation and access to connectors, switchboard panels and consoles must be accessible from the rear. The unit can be installed in switchgear cubicles or cabinets with wall thicknesses of 2mm to 13mm (0.079 – 0.5 inches). For optimum sealing with the cabinet face, the recommended wall thickness is

3mm (0.118 inches).

Air Inlets and outlets must have at least 25mm (approx. 1.0 inch) of space around them and not be obstructed. Adequate airflow around the exterior of the unit is important to the interior temperature of the unit. Two fans are used to create air flow through the industrial computer to maintain a correct working temperature.

Caution

Only correct mounting ensures front-side NEMA and IP65 protection

Caution

The IC5005/BC5005 and IC5008/BC5008 units must be installed and operated in a vertical position to ensure the correct operating position of the CD-ROM drive.

Caution

Viewed from the front, there must be sufficient space (132 mm or

5.20in. minimum) to the left of the units to allow the CD-ROM drive drawer to open.

3-1

Page 16
Image 16
GE BC5008, IC5002, BC5005, IC5005, IC5008, BC5002 user manual Installation