MTFTIPDMCE lH=~lON lN~U~lONS

N~: A risk of range tip-ver ~sts if the appfiance is not instied in accordance with the initiation instructions provided. me proper use of this device ~es the risk of ~P- O~R In using this detice tie consumer must sti~ observe the safety instructions as stated in the USE and Cm GU~E and avoid uskg the oven door and/or lower drawer as a step stool.

hstilation instructions are provided for wood and cement in eitier floor or wW. Any other m of construction may require special ins~tion techniques as deemed necessary to provide adequate fastening of the AN~-TF bracket to the floor or wd. Ethe anti-tip device supptied with the range does not fit this application, use the universal anti-tip device WB02X7909.

Step l—bca~ tie Bracket

A Mark the floor or ~ where either the right or left ‘EDGE” of the 20inch opening is to be loated.

B. Place the BWC= S~E, see figure 1, 31%* inch from the marked “EDGE” toward center of opening and against the back wW.

C. Use the bracket as a template and mark the required holes, as shown in figure 1, for the type of construction you ~ be using.

Step >Anti-Tip Bracket Ins*tion A Woti Construction:

1. moor:

bcate the center of the 2 holes identified in figure 1 as “F~OR-WOOD~ Dfl a l/&inch pilot hole in the center of each hole (a nail or awl may be used if a til is not av~ble).

Secure the AN~-~ bracket to the floor witi the 2 screws provided. Proceed to Step 3.

2.Wd:

tite the center of the 2 holes identified in -e 1 as W_P~~’~Dflan angled 1/8 inch pflot hole in the center of each hole as shown in&e 2. (And or awl maybe used if a ~ is not avfible). Secure the ~-~ bracket to the ti with the 2 screws provided as shown in figure 2. Proceed to Step 3.

B. Cement or Con-te Construction:

1.Suitable screws for concrete construction can be obtained at the hardware store. Dri~ the required she hole for the hardware obtied into the concrete at the center of the holes identied in figure 1 as ‘F~OR- CEME~~ Secure the AN~-~P bracket to the floor. Proceed to Step 3.

Step 3—~e InsMation

A Complete the initiation of the range per the initiation instructions provided with the produti

B. ~gn the range to ik designated location and shale it back into position. N~: A minimum clearance of 5/&inch is required between the range and the levehg foot that will engage the AN~-~P bracket see figure 2.

C. For SAF~ CONSIDEW~ONS as we~ as optimum performance adjust the range so that it is level. ~is maybe checked by phcing a level or a large pan of water on the cooktop or the oven rack. U an adjustment is required pun the range forward, tip the range and rotate the level feet as required.

D. To check tie range for proper instigation of the AN~-~P bracket use a flashkht and look underneath tie bottom of the range to see that one of the rear IeveMg legs is engaged in the bracket slot

E. Proceed witi the remainder of the initiation instructions provided with the range.

d

FIGURE ONE

FIGURE WO

Page 28
Image 28
GE JGAS02EN, JMS02PN, JGAS02PN manual ~e InsMation

JGAS02PN, JGAS02EN, JMS02PN specifications

The GE JMS02PN, JGAS02EN, and JGAS02PN are advanced gas turbine products developed by General Electric, renowned for their application in various energy and industrial sectors. These turbines represent cutting-edge engineering and design, focusing on delivering high efficiency, reliability, and sustainability.

The JMS02PN model is notable for its performance in power generation applications. With a significant output capacity, it is designed to operate efficiently across a wide range of conditions. Its advanced aerodynamics and combustion technologies allow for reduced emissions while maximizing fuel efficiency. The turbine also features a sophisticated control system that optimizes performance in real-time, ensuring that it can adapt to varying load demands.

Moving on to the JGAS02EN model, this turbine is engineered for enhanced environmental performance. It incorporates GE’s innovative dry low NOx combustion technology, which minimizes nitrogen oxide emissions, making it compliant with stringent environmental regulations. The JGAS02EN is suitable for both industrial and commercial applications due to its flexibility and scalability, allowing users to implement it in diverse operational contexts.

Similarly, the JGAS02PN shares several characteristics with the JGAS02EN but is tailored for specific industrial needs. The JGAS02PN is designed to operate in more challenging environments, offering exceptional durability and long service intervals. This model features advanced materials and coatings that withstand high temperatures and corrosive conditions, ensuring reliability and longevity in operation.

All three models leverage advanced technologies such as digital twin simulations and predictive maintenance capabilities, enabling operators to monitor performance accurately and perform proactive interventions. This technology ensures not only efficiency but also a significant reduction in downtime, leading to lower operational costs.

In summary, the GE JMS02PN, JGAS02EN, and JGAS02PN turbines exemplify the pinnacle of gas turbine technology. They are designed to meet the demands of today's energy landscape, emphasizing performance, sustainability, and adaptability. With their innovative features and robust construction, these turbines are set to play a pivotal role in the future of power generation and industrial applications. Whether aiming for high efficiency, lower emissions, or superior durability, these models offer unparalleled solutions for modern energy challenges.