Gold's Gym GGBE6974.1 manual

Models: GGBE6974.1

1 40
Download 40 pages 12.95 Kb
Page 17
Image 17

31. Route the Low Cable (72) under a 90mm Pulley

31

(58). Attach the Pulley and two Half Finger

72

Guards (40) to the Center Base (2) with an M10 x

40

46mm Button Bolt (100) and an M10 Nylon

58

Locknut (79).

100

 

 

2

 

40

 

79

32. Wrap the Low Cable (72) over a 90mm Pulley

32

(58). Attach the Pulley to the Top Frame (16) with

79

an M10 x 42mm Button Bolt (96) and an M10

96

Nylon Locknut (79).

 

 

 

16

 

 

58

 

 

72

33. Attach the Low Cable (72) to the “U”-bracket (47)

33

 

with an M6 Washer (86) and an M6 Nylon

 

 

 

Locknut (80). See the inset drawing. Do not

 

 

overtighten the Nylon Locknut; it should be

 

 

threaded onto the end of the Cable so that

 

 

only two threads are showing below the Nylon

72

 

Locknut.

 

 

47

47

 

86

45

 

80

 

72

34. Locate the Long Cable (54). Route the Cable

34

 

over a 90mm Pulley (58), and up through a

 

 

 

Swivel Arm (32) and the Left Upright (3). Attach

 

 

the Pulley inside the Swivel Arm with an M10 x

32

84

53mm Button Bolt (147), two M10 Washers (84),

75

two 6mm Spacers (75), and an M10 Nylon

75

147

3

Locknut (79).

84

 

 

79

 

 

 

54

 

58

 

 

17

 

Page 17
Image 17
Gold's Gym GGBE6974.1 manual