Setup

3.Electrical requirements See table 1.

Installing this equipment requires access to parts which may cause electric shock or other serious injury if work is not performed properly. Have a qualified electrician connect power and ground to main power switch terminals, see step 3. Be sure your installation complies with all National, State and Local safety and fire codes.

Table 1: Electrical Requirements (kW/Full Load

Amps)

 

 

 

Full

 

 

 

 

Load

 

 

 

Voltage

Peak

System

Part

Model

(phase)

Amps*

Watts**

 

 

 

 

 

256886

H-VR

230V (3)

71

26,600

 

 

 

 

 

256887

H-VR

400V (3)

41

26,600

 

 

 

 

 

*Full load amps with all devices operating at maxi- mum capabilities. Fuse requirements at various flow rates, ratios, and mix chamber sizes may be less.

**Total system watts, based on maximum hose length for each unit, 410 ft (125 m) including whip hose.

4.Connect electrical cord

NOTE:

Power cord is not suppled. See table 2.

Table 2: Power Cord Requirements

 

 

Cord Specification

Part

Model

AWG (mm2)

256886

H-VR

4

(21.2), 3 wire + ground

 

 

 

 

256887

H-VR

8

(8.4), 4 wire + ground

 

 

 

 

a.230V, 3 phase: Using 5/32 or 4 mm hex allen wrench, connect three power leads to L1, L2, and L3. Connect green to ground (GND).

GND

L1

L2

ti2515b

b.400V, 3 phase: Using 5/32 or 4 mm hex allen wrench, connect three power leads to L1, L2, and L3. Connect neutral to N. Connect green to ground (GND).

GND

L1

L2

L3

ti3248b

NOTE:

The motor must rotate counter-clockwise when viewed from shaft end. To reverse rotation, disconnect power and reverse power leads L1 and L2.