Grizzly G0609 Dust Port Test Run, Recommended CFM at Dust Port ... CFM, To test run the machine

Models: G0609

1 60
Download 60 pages 13.02 Kb
Page 21
Image 21

Dust Port

 

Test Run

 

 

 

 

 

 

DO NOT operate the Model G0609 with- out an adequate dust collection system. This machine creates substantial amounts of wood dust while operating. Failure to use a dust collection system can result in short and long-term respiratory illness.

The dust port is installed at the factory, so just attach it to an adequate dust collection system.

Recommended CFM at Dust Port: .... 615 CFM

Do not confuse this CFM recommendation with the rating of the dust collector. To determine the CFM at the dust port, you must take into account many variables, including the CFM rating of the dust collector, the length of hose between the dust collector and the machine, the amount of branches or wyes, and the amount of other open lines throughout the system. Explaining this cal- culation is beyond the scope of this manual. If you are unsure of your system, consult an expert or purchase a good dust collection "how-to" book.

G0609 12" Parallelogram Jointer

Once the assembly is complete, test run your machine to make sure it runs properly.

If, during the test run, you cannot easily locate the source of an unusual noise or vibration, stop using the machine immediately, then review the Troubleshooting on Page 32.

If you still cannot remedy a problem, contact our Tech Support at (570) 546-9663 for assistance.

To test run the machine:

1.Connect the machine to the power source.

2.Twist the STOP button so it pops out.

3.Make sure you have read the safety instruc- tions at the beginning of the manual and that the machine is setup properly.

4.Make sure all tools and objects used during set up are cleared away from the machine.

5.Turn the machine ON.

6.Press the STOP button, then restart the jointer.

7.Listen to and watch for abnormal noises or actions. The machine should run smoothly with little or no vibration or rubbing noises.

—Immediately turn the jointer OFF if you suspect any problems, and refer to Page 32 to troubleshoot/fix any problems before starting the jointer again.

If the source of an unusual noise or vibra- tion is not readily apparent, contact our Technical Support at (360) 546-9663.

-19-

Page 21
Image 21
Grizzly G0609 owner manual Dust Port Test Run, Recommended CFM at Dust Port ... CFM, To test run the machine